The Indian Railways will quickly launch the brand new saffron-coloured Vande Bharat Express in India, footage of which have been not too long ago shared by the Railway Minister Ashwini Vaishnaw throughout his go to to the Integrated Coach Factory in Chennai. He inspected the brand new rake and introduced that the saffron-coloured semi-high pace practice is impressed by the tricolour of India. Now for the primary time, the Vande Bharat Express has been noticed to have hit the railway tracks exterior the ICF manufacturing unit. The new saffron Vande Bharat Express will not be but operational and is at present stationed at ICF, the place Vande Bharat trains are manufactured, reported ANI.
Railway officers earlier introduced that the twenty eighth rake of the Indian-built semi-high-speed Vande Bharat Express shall be ‘saffron’ in color. A complete of 25 Vande Bharat Express trains are operational in India now, whereas two extra Vande Bharat rakes within the conventional white and blue livery are already manufactured. “The colour of this 28th rake is being changed on a trial basis,” they stated. It was earlier anticipated that the twenty eighth rake shall be made operational on the Independence Day, on August 15.
However, later stories urged that August 19 would be the date when the brand new saffron-train shall be inaugurated. However, it’s additional delayed and there is no official news on when it should carry the primary set of passengers. Union minister earlier stated that the brand new color of the twenty eighth rake of the indigenous practice is “inspired by Indian Tricolour”. He stated that 25 enhancements have finished within the Vande Bharat trains.
“This is a concept of Make In India, (which means) designed in India, by our own engineers, and technicians. So whatever feedback we are receiving from the field units, regarding ACs, toilets, etc., during the operation of Vande Bharat, all those improvements are being used for making changes in the design,” Vaishnaw stated in a press briefing.
“A new safety feature, ‘anti climbers’, or anti-climbing devices, on which we are working, were also reviewed today. These will be standard features in all the Vande Bharat and other trains,” he added. It is pertinent to notice that India’s semi-high-speed practice set, now presents its providers in all rail-electrified states throughout the nation.
The first Vande Bharat Express was flagged off on February 15, 2019, by the Prime Minister, operating between New Delhi and Varanasi. Manufactured on the Integral Coach Factory (ICF) in Chennai, the practice set symbolizes the ‘Make-In-India’ initiative and showcases India’s engineering prowess
Source: zeenews.india.com